DEX: (D004) work_package_definition — Work Package Definition | Date: 2007/09/14 16:11:29 Revision: 1.86 |
ISO 10303-239 Activity Model Coverage
ISO 10303-239 Activity Model Definitions
ISO 10303-239 Activity Definitions
ISO 10303-239 ICOM Definitions
Emerging or Supplementary Work
Business Information Requirements
Representing the Complete Package of Work
Basic Work Package Configuration
Identification of the Opportunity
Types of Opportunity - the Why
Approval of Opportunity - the Who
Location of Opportunity - the Where
Period of Opportunity - the When
Asset Assigned to an Opportunity - the What
Scheme Entry Characterizations
Scheme Entry and Directed Activities
Adding Items into a Scheme Entry
Scheme_entry - Activity Combinations
Relationships between items of work
Assigning Required Resource Items
Documenting the Definition of activities
Activity_method Identification
Activity_method Classification
Activity_method Identification
Activity_method Identification
Referencing Tasks within a Task Library
Referencing the Product In Focus
Identification of the PIF in Context
Figures
Figure 1 — A41 Plan and control support delivery
Figure 2 — A411 Plan support activity
Figure 3 — A412 Control support activity
Figure 4 — DEX Business Scope Overview
Figure 5 — DEX4 Life Cycle Context
Figure 6 — DEX Scope as Capabilities
Figure 7 — Basic Configuration for Representing a Complete Work Package
Figure 8 — Basic Configuration for a scheme of work.
Figure 9 — Work Order Overview and Template Usage
Figure 10 — Basic work order authentication
Figure 11 — Assigning Assessed and Asserted State Templates
Figure 12 — Basic Work Request Reference
Figure 13 — Directed_activity Overview and Template Usage
Figure 14 — Life Cycle Opportunity Overview and Template Usage
Figure 15 — Example Life Cycle Opportunity Location
Figure 16 — Example linking the Opportunity to the Directive
Figure 17 — Relating the Directed_activity to a planned Life Cycle Opportunity
Figure 18 — Life Cycle Opportunity Relationships Overview
Figure 19 — Scheme Overiew and Template Usage
Figure 20 — Scheme of work (also known as Work Package).
Figure 21 — Scheme Subject Assignment Overiew and Template Usage
Figure 22 — Work package and Life Cycle Opportunity
Figure 23 — Scheme Entry Overview and Template Usage
Figure 24 — Scheme Entry and Directed Activities
Figure 25 — Scheme_entry_assignment: Adding Items to an entry
Figure 26 — Scheme_entry Sequencing
Figure 27 — Activity Overview and Template Usage
Figure 28 — Assigning Required Resource Item Template
Figure 29 — Shorthand Assigning Required Resource Item Template
Figure 30 — Assigning other objects to Required Resources
Figure 31 — Structure of an Activity
Figure 32 — Definition of an Activity
Figure 33 — Activity_method and template usage
Figure 34 — Default Typical Activity_method
Figure 35 — Enhanced Typical Activity_method
Figure 36 — Updating a Typical Activity
Figure 37 — Referencing a Task within a Task Library
Figure 38 — EXPRESS-G diagram for identifying product in focus
Figure 39 — PIF Usage Overview
Figure 40 — Relating Products to Parts
Figure 41 — A Part referenced as a Resource Item
Figure 42 — Concession template shorthand with optional characterizations.
Figure 43 — A Justified concession (with documents)
Figure 44 — A Justified concession (with documents)
Figure 45 — A Conditional concession (with documents)
Figure 46 — A Conditional concession (with documents)
Figure 47 — Basic EXPRESS-G for DEX4.
Template tables
© OASIS 2010 — All rights reserved