DEX: (D004) work_package_definition — Work Package Definition Date: 2007/09/14 16:11:29
Revision: 1.86

Table of Contents

Abstract

Introduction

Terms

Scope

ISO 10303-239 Activity Model

ISO 10303-239 Activity Model Coverage

ISO 10303-239 Activity Model Definitions

ISO 10303-239 Activity Definitions

ISO 10303-239 ICOM Definitions

Business Overview

Business introduction

Business Scope Overview

Support Opportunity

Work Package Compilation

Work Specification

Work Authorization

Emerging or Supplementary Work

DEX Context

DEX Role

Business Information Overview

Business Information Requirements

ISO 10303-239 Representation

Model Overview

Representing the Complete Package of Work

Basic Work Package Configuration

Work Orders

Work Order Identification

Work Order Classification

Work Order Approval

Work Order Status

Work Order Characterizations

Responsible Organization

Issue Date

Responsible Person

Assigning_documents

Referencing a Work request

Life Cycle Directive

Life Cycle Opportunity

Overview

Identification of the Opportunity

Types of Opportunity - the Why

Approval of Opportunity - the Who

Location of Opportunity - the Where

Period of Opportunity - the When

Alternate Locations

Asset Assigned to an Opportunity - the What

Link to directive

Scheme of Work (Work Package)

Scheme identification

Scheme classification

Scheme relationship

Scheme version

Scheme version relationship

Characterizations

Scheme dates

Scheme approvals

Scheme subject assignments

Scheme as an Activity_method

Representing Items of Work

Scheme Entry

Scheme Entry Identification

Scheme Entry Classification

Scheme Entry Relationships

Scheme Entry Characterizations

Assigning Calendar Dates

Scheme Entry Approvals

Scheme Entry and Directed Activities

Adding Items into a Scheme Entry

Scheme Entry Resource Items

Scheme_entry - Activity Combinations

Relationships between items of work

Activity

Characterizations

Assigning Calendar Dates

Assigning Approvals

Assigning Required Resource Items

Resource Item Relationships

Resource Item Assignment

Resource Quantities

Structure of work items

Documenting the Definition of activities

Typical Work Items

Activity_method Identification

Activity_method Classification

Activity_method Definition

Activity_method Identification

Activity_method Identification

Enhancing Typical Activities

Referencing Tasks within a Task Library

A note on Approvals

Referencing the Product In Focus

PIF Contexts

Top-Level Asset

Next Higher Level Equipment

End Item

Identification of the PIF in Context

Variances

Concessions

Justified Concessions

Conditional Concessions

Navigation of the Data Model

Templates

Capabilities

Schemas

Reference Data

Conformance

Bibliography

 

Figures

Figure 1 —  A41 Plan and control support delivery

Figure 2 —  A411 Plan support activity

Figure 3 —  A412 Control support activity

Figure 4 —  DEX Business Scope Overview

Figure 5 —  DEX4 Life Cycle Context

Figure 6 —  DEX Scope as Capabilities

Figure 7 —  Basic Configuration for Representing a Complete Work Package

Figure 8 —  Basic Configuration for a scheme of work.

Figure 9 —  Work Order Overview and Template Usage

Figure 10 —  Basic work order authentication

Figure 11 —  Assigning Assessed and Asserted State Templates

Figure 12 —  Basic Work Request Reference

Figure 13 —  Directed_activity Overview and Template Usage

Figure 14 —  Life Cycle Opportunity Overview and Template Usage

Figure 15 —  Example Life Cycle Opportunity Location

Figure 16 —  Example linking the Opportunity to the Directive

Figure 17 —  Relating the Directed_activity to a planned Life Cycle Opportunity

Figure 18 —  Life Cycle Opportunity Relationships Overview

Figure 19 —  Scheme Overiew and Template Usage

Figure 20 —  Scheme of work (also known as Work Package).

Figure 21 —  Scheme Subject Assignment Overiew and Template Usage

Figure 22 —  Work package and Life Cycle Opportunity

Figure 23 —  Scheme Entry Overview and Template Usage

Figure 24 —  Scheme Entry and Directed Activities

Figure 25 —  Scheme_entry_assignment: Adding Items to an entry

Figure 26 —  Scheme_entry Sequencing

Figure 27 —  Activity Overview and Template Usage

Figure 28 —  Assigning Required Resource Item Template

Figure 29 —  Shorthand Assigning Required Resource Item Template

Figure 30 —  Assigning other objects to Required Resources

Figure 31 —  Structure of an Activity

Figure 32 —  Definition of an Activity

Figure 33 —  Activity_method and template usage

Figure 34 —  Default Typical Activity_method

Figure 35 —  Enhanced Typical Activity_method

Figure 36 —  Updating a Typical Activity

Figure 37 —  Referencing a Task within a Task Library

Figure 38 —  EXPRESS-G diagram for identifying product in focus

Figure 39 —  PIF Usage Overview

Figure 40 —  Relating Products to Parts

Figure 41 —  A Part referenced as a Resource Item

Figure 42 —  Concession template shorthand with optional characterizations.

Figure 43 —  A Justified concession (with documents)

Figure 44 —  A Justified concession (with documents)

Figure 45 —  A Conditional concession (with documents)

Figure 46 —  A Conditional concession (with documents)

Figure 47 —  Basic EXPRESS-G for DEX4.

 

Template tables