Capability (C022):— representing_work_package Date: 2007/07/11 16:32:00
Revision: 1.12

Issue raised against: representing_work_package

GENERAL issues


Open issue Issue: RBN-1 by Rob Bodington (04-01-15) minor_technical issue
Resolution: Accept. Status: open

This capability may be redundant as it may be covered by representing-work_order, representing_scheme, representing_task, which will all be brought together at the DEX level + relevant reference data.
Comment: (Nigel Newling 11Oct04)
While I accept that the business DEX addressed by this Capability could be achieved by a tailored use of representing_scheme, the DEX 4 / DEX 9 requirement does not call for that Capability's ability to represent a full blown project plan with all the tools required to define all the possible interactions between the various scheme_entry elements. I have, therefore, retained this Capability for now. If concensus believes this to be the wrong solution, then I will look again.