Capability (C032):— representing_activity | Date: 2008/02/07 12:34:21 Revision: 1.50 |
Issue: NN-1 by Nigel Newling (05-11-16) [minor_technical, closed] - {Type = introduction}
Describes three types of activity. Should this include event?Comment: (Rob Bodington 06-06-27)
A note has been added to explain that events are to treated as actual activities
This capability describes how activities are represented. The activity may be:
EXAMPLE The changing of a flat tyre by the car driver.
EXAMPLE The running of fault diagnostics on a car engine by automatic test equipment.
EXAMPLE The running of a car engine.
This capability does not describe the use of activities that are part of a formal change process, and that are related to a Directed_activity and a Work_order. See capability C065: representing_work_order (includes Directed_activity) and C064: representing_work_done (contains a special usage of Activity_actual).
© OASIS 2010 — All rights reserved